Composition Of Clean Workshop
2021年3月25日 日常Clean workshops generally include equipment areas (including rooms for purifying air-conditioning systems, electrical rooms, rooms for high-purity water and high-purity gas, rooms for cooling and heating equipment, etc.), management areas (including offices, duty, management, and restrooms, etc.), clean rooms Auxiliary rooms (including personnel purification rooms, material purification rooms and some living rooms, etc.), production areas. The last three types of buildings are all facilities that serve clean production areas.
1. Clean auxiliary room, which is an indispensable room for clean workshops. The air cleanliness levels of these rooms are designed according to the requirements of customers, and are designed in accordance with the regulations in the "Code for Design of Clean Plants" GB50073-2001.
2. Equipment area, that is, rooms for purification air-conditioning systems, public power systems, etc. This part is an important part of the clean workshop. At present, in the design of clean workshops, purifying air-conditioning equipment, cooling and heating (excluding boiler rooms) equipment, and water and electricity facilities are often arranged in clean workshops, which is convenient for management and can reduce pipeline length.
3. Clean production area, which is the main part of the clean workshop. The air cleanliness level of the clean production area is determined according to the product production process requirements. This is the main basis for the design of clean building workshops. In addition to providing construction drawings, please provide the production Various design conditions of the product, such as temperature, humidity, air flow pattern requirements, the nature of the raw and auxiliary materials required for production and the requirements of water, electricity, and gas, noise, vibration, static electricity and other environmental conditions and requirements.
4. Management area. This is the room for production management, technical management and necessary rest and welfare for the operators in the clean workshop. Wuxi Chengyi Purification Equipment Co., Ltd. can design according to customer requirements.
1. Clean auxiliary room, which is an indispensable room for clean workshops. The air cleanliness levels of these rooms are designed according to the requirements of customers, and are designed in accordance with the regulations in the "Code for Design of Clean Plants" GB50073-2001.
2. Equipment area, that is, rooms for purification air-conditioning systems, public power systems, etc. This part is an important part of the clean workshop. At present, in the design of clean workshops, purifying air-conditioning equipment, cooling and heating (excluding boiler rooms) equipment, and water and electricity facilities are often arranged in clean workshops, which is convenient for management and can reduce pipeline length.
3. Clean production area, which is the main part of the clean workshop. The air cleanliness level of the clean production area is determined according to the product production process requirements. This is the main basis for the design of clean building workshops. In addition to providing construction drawings, please provide the production Various design conditions of the product, such as temperature, humidity, air flow pattern requirements, the nature of the raw and auxiliary materials required for production and the requirements of water, electricity, and gas, noise, vibration, static electricity and other environmental conditions and requirements.
4. Management area. This is the room for production management, technical management and necessary rest and welfare for the operators in the clean workshop. Wuxi Chengyi Purification Equipment Co., Ltd. can design according to customer requirements.